For office fit-out distributors and international contract suppliers, FY-05 provides a practical frame-only platform that can be packed flat, delivered by project phase and combined with locally specified desktops. The four-post format and synchronized dual-motor system support adjustable commercial workstations without locking the buyer into one tabletop size.
Knock-down frame supports export carton packing and project-site assembly.
Adjustable 950-1450 mm width helps match multiple workstation schedules.
Four-post layout offers a balanced structural footprint.
Frame-only supply reduces restrictions on local desktop materials.
Labels, manuals and carton marks can be aligned with project logistics.
| No. | Attribute | Specification |
|---|---|---|
| 1 | Model ID | FY-05 |
| 2 | Product format | 4-post sit-stand workstation frame |
| 3 | Catalog category | Dual motor standing desk |
| 4 | Supply positioning | Office fit-out frame system |
| 5 | Post quantity | 4 |
| 6 | Powered column quantity | 4 |
| 7 | Motor quantity | 2 |
| 8 | Motor relationship | Synchronized dual drive |
| 9 | Lift stage | Two-stage |
| 10 | Column build | Two-section telescopic |
| 11 | Frame low position | 710 mm |
| 12 | Frame high position | 1160 mm |
| 13 | Lift stroke | 450 mm |
| 14 | Minimum width | 950 mm |
| 15 | Maximum width | 1450 mm |
| 16 | Width extension | 500 mm |
| 17 | Upper support dimension | 550 mm depth |
| 18 | Floor base dimension | 600 mm length |
| 19 | Main construction material | Steel |
| 20 | Main finish | Powder coating |
| 21 | Illustrated color | White |
| 22 | Finish customization | Reviewed for project batches |
| 23 | Included assembly | Electric desk frame components |
| 24 | Desktop | Not included in standard frame supply |
| 25 | Frame-width feature | Telescopic cross members |
| 26 | Post shape | Rectangular |
| 27 | Stance | Four-point floor layout |
| 28 | Floor adjustment | Leveling feet |
| 29 | Floor protection | Contact pads |
| 30 | Control package A | Wired up/down handset |
| 31 | Control package B | Programmable memory handset |
| 32 | Anti-collision package | Optional |
| 33 | Overload package | Optional |
| 34 | Thermal package | Option based on motor system |
| 35 | Motion profile package | Soft start and stop option |
| 36 | Destination voltage | Configured to project country |
| 37 | Destination plug | Configured to project country |
| 38 | Rated capacity | Confirmed in project submittal |
| 39 | Travel speed | Confirmed in project submittal |
| 40 | Noise data | Confirmed in project submittal |
| 41 | Cable accessory interface | Compatible after layout review |
| 42 | Handset installation point | Under tabletop |
| 43 | Product assembly form | Knock-down |
| 44 | Site connection method | Bolted mechanical assembly |
| 45 | Installer information | Assembly guide available |
| 46 | Export packing | Carton |
| 47 | Shipment density format | Flat-pack |
| 48 | Carton identification | Project and OEM marks available |
| 49 | Product identification | Custom labels available |
| 50 | Instruction customization | Subject to order scope |
| 51 | Buyer category | Fit-out suppliers, importers and distributors |
| 52 | Main project scenario | Office fit-out programs |
| 53 | Secondary scenario | Phased corporate renovation |
| 54 | Installation location | Indoor office |
| 55 | Procurement structure | Scheduled project batches |
| 56 | MOQ approach | Based on fit-out specification |
| 57 | Pre-production sample | Subject to agreed project procedure |
| 58 | Inspection procedure | Approved sample and order checklist |
| 59 | Warranty terms | Stated in supply contract |
| 60 | Project customization | Electrical package, color, labels, manual and cartons |
Adjustable height 710-1160 mm; adjustable width 950-1450 mm; upper support depth 550 mm; floor foot length 600 mm.
Corporate renovation, headquarters relocation, tenant office packages, phased workstation replacement, dealer installation projects and international contract supply.
Desktop drawings, rated load, lift speed, noise, voltage, controller options, safety functions and compliance documentation are finalized in the approved project submittal.



